How Much Is The House To Build A Calculator
The cost of building a house is the most important issue for the customer that needs to be resolved before the construction begins. The most common method used is the cost per square metre of the house. However, this method is extremely difficult because of the ambiguous understanding of " home areas " . The builders generally understand the area, the area of everything that is built, and the outer contour of the walls. And housing is more important to the customer. The building area in the same building may be 2 times more than the dwelling. So a more reliable way is to recognize the price in the rubles (and not in the rubles for 1 m.q.) of the specific building.
Also, the cost of building houses depends heavily on the cost of construction materials used and the architectural characteristics of the cottage.
Okay. the cost of the house You want to build?
In order to be perfectly accurate (before the rubble) to assess the price of construction works, a full-fledged project and full cost estimates are required. In our experience, none of the clients have a full package of documents, and if they are (e.g., a purchased ready project), they tend to be interested in the transferrings. The full estimates in turn are up to 2-3 per cent of the estimated cost of construction, and rare customers are willing to pay for its development. Moreover, a full-time work project and full costing would take considerable time (more than the customers ' expectations for construction time).
But is there a need for a perfectly accurate assessment of the " before the rouble " in the construction of the cottages?
Given the constant price changes in construction materials, it is unlikely. For the construction of individual cottages does not purchase construction materials on public tenders, individual cottages are not subject to State scrutiny.
We also note that the services of designers and markers are very cheap.
There is now a tendency that not designers, but construction materials producers bring knowledge and technology. Vulnerable specialists (technologists, designers) are necessarily in the state of any major construction producer. It is their responsibility to develop technical solutions. These albums continue to use " designers " in their work. Thus, the designer today does not require any introduction or innovation, and its work is essentially limited to copying the producer ' s technical solutions.
In turn, the estimates for such projects are very lengthy, as any change requires agreement with the designer, development of specifications, and then manual changes to the estimates. And this long process can't be described as comfortable for the customer.